{"id":3614,"date":"2026-09-16T10:58:04","date_gmt":"2026-09-16T10:58:04","guid":{"rendered":"https:\/\/www.indextap.com\/blog\/?p=3614"},"modified":"2026-09-16T10:58:33","modified_gmt":"2026-09-16T10:58:33","slug":"thane-coastal-road-1-reaches-40-percent-completion","status":"publish","type":"post","link":"https:\/\/www.indextap.com\/blog\/thane-coastal-road-1-reaches-40-percent-completion\/","title":{"rendered":"Thane Coastal Road-1 Reaches 40% Completion"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">As construction on Thane Coastal Road-1 advances, commuters on the congested Ghodbunder Road may ultimately have an alternative route. According to the Mumbai Metropolitan Region Development Authority (MMRDA), the 13.45-kilometer corridor is 40% complete.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The six-lane, access-controlled greenfield road is being built between Kharegaon Toll Naka and Gaimukh. MMRDA stated that 40% of the work was finished as of September 2, with the milestone reached in 14 months.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Once constructed, the corridor is expected to relieve congestion on Ghodbunder Road, separate local and inter-city traffic, and improve interconnectivity for cars traveling to Thane, Bhiwandi, Gujarat, Nashik, and North India.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What is the current situation?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Construction is currently ongoing on the project&#8217;s foundations, piers, and elevated sections. According to MMRDA&#8217;s official post on X, 332 of the 426 working piles, or 77%, have been constructed, while 277 of the 426 piers, or 65%, are ready.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A total of 460 pier caps have been laid. Of the intended 1,632 I-girders, 501 have been built, accounting for approximately 30% of the work in this category. In addition, 13 deck-slab spans were built.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How would it benefit Ghodbunder Road commuters?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A main goal of Thane Coastal Road-1 is to create an alternative route and relieve congestion on Ghodbunder Road.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">MMRDA stated that the project is &#8220;designed as a strategic freight corridor&#8221; and will improve connectivity between NH-160 (Mumbai-Nashik Highway) and Gaimukh along the Thane Creek coastline.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project has been allocated a Development Plan road that is 40-45 meters wide. According to MMRDA, the project will help to divide local and intercity traffic on Ghodbunder Road.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The authority intends the corridor to provide faster, safer, and more convenient connectivity for traffic headed to Thane, Gujarat, Nashik, Bhiwandi, and North India.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Elevated road through mangrove areas.<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The project includes a 240-meter creek bridge and an 8.11-kilometer elevated road that runs through mangrove habitats. MMRDA stated that substantial portions are being built on viaducts and bridges to protect the vulnerable mangrove ecology.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The authorities also highlighted one of the project&#8217;s engineering features. According to the MMRDA, this is India&#8217;s first greenfield road project to use a single-pile, single-pier system with land-based monopile foundations.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Direct access to Gaimukh-Fountain Hotel Tunnel<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Thane Coastal Road-1 would connect directly to the proposed Gaimukh-Fountain Hotel Tunnel in Gaimukh. MMRDA stated that the connection will provide seamless Thane-Bhayander connectivity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Together, the initiatives aim to decongest Ghodbunder Road and increase freight transportation to JNPT, Wadhawan Port, Karnataka, and South Maharashtra. Thane Coastal Road-2 is also intended to connect with future infrastructure, such as the Thane Ring Road, Saket-Amane Elevated Corridor, Thane Coastal Road-2, and Kasarvadavali-Kharbhav Road.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Stay informed with <a href=\"https:\/\/www.indextap.com\/blog\/\">IndexTap<\/a> for the latest updates on Mumbai\u2019s infrastructure and real estate developments.<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>As construction on Thane Coastal Road-1 advances, commuters on the congested Ghodbunder Road may ultimately have an alternative route. According to the Mumbai Metropolitan Region Development Authority (MMRDA), the 13.45-kilometer corridor is 40% complete. The six-lane, access-controlled greenfield road is being built between Kharegaon Toll Naka and Gaimukh. MMRDA stated that 40% of the work [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3615,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-container-style":"default","site-container-layout":"default","site-sidebar-layout":"default","disable-article-header":"default","disable-site-header":"default","disable-site-footer":"default","disable-content-area-spacing":"default","footnotes":""},"categories":[9],"tags":[],"class_list":["post-3614","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.10 - aioseo.com -->\n\t<meta name=\"description\" content=\"As construction on Thane Coastal Road-1 advances, commuters on the congested Ghodbunder Road may ultimately have an alternative route. According to the Mumbai Metropolitan Region Development Authority (MMRDA), the 13.45-kilometer corridor is 40% complete.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"indextapadmin\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.indextap.com\/blog\/thane-coastal-road-1-reaches-40-percent-completion\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.10\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"IndexTap Blogs - Real Estate Market Updates, NEWS, Trends\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Thane Coastal Road-1 Reaches 40% Completion\" \/>\n\t\t<meta property=\"og:description\" content=\"As construction on Thane Coastal Road-1 advances, commuters on the congested Ghodbunder Road may ultimately have an alternative route. According to the Mumbai Metropolitan Region Development Authority (MMRDA), the 13.45-kilometer corridor is 40% complete.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.indextap.com\/blog\/thane-coastal-road-1-reaches-40-percent-completion\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-09-16T10:58:04+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-09-16T10:58:33+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Thane Coastal Road-1 Reaches 40% Completion\" \/>\n\t\t<meta name=\"twitter:description\" content=\"As construction on Thane Coastal Road-1 advances, commuters on the congested Ghodbunder Road may ultimately have an alternative route. According to the Mumbai Metropolitan Region Development Authority (MMRDA), the 13.45-kilometer corridor is 40% complete.\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/thane-coastal-road-1-reaches-40-percent-completion\\\/#blogposting\",\"name\":\"Thane Coastal Road-1 Reaches 40% Completion\",\"headline\":\"Thane Coastal Road-1 Reaches 40% Completion\",\"author\":{\"@id\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/author\\\/indextapadmin\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Thane-Coastal-Road-1-Reaches-40-Completion.png\",\"width\":1672,\"height\":941,\"caption\":\"Thane Coastal Road-1 Reaches 40% Completion\"},\"datePublished\":\"2026-09-16T10:58:04+00:00\",\"dateModified\":\"2026-09-16T10:58:33+00:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/thane-coastal-road-1-reaches-40-percent-completion\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/thane-coastal-road-1-reaches-40-percent-completion\\\/#webpage\"},\"articleSection\":\"Blog\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/thane-coastal-road-1-reaches-40-percent-completion\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.indextap.com\\\/blog#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.indextap.com\\\/blog\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/category\\\/blog\\\/#listItem\",\"name\":\"Blog\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/category\\\/blog\\\/#listItem\",\"position\":2,\"name\":\"Blog\",\"item\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/category\\\/blog\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/thane-coastal-road-1-reaches-40-percent-completion\\\/#listItem\",\"name\":\"Thane Coastal Road-1 Reaches 40% Completion\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.indextap.com\\\/blog#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/thane-coastal-road-1-reaches-40-percent-completion\\\/#listItem\",\"position\":3,\"name\":\"Thane Coastal Road-1 Reaches 40% Completion\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/category\\\/blog\\\/#listItem\",\"name\":\"Blog\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/#organization\",\"name\":\"IndexTap Blogs\",\"description\":\"Real Estate Market Updates, NEWS, Trends\",\"url\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/author\\\/indextapadmin\\\/#author\",\"url\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/author\\\/indextapadmin\\\/\",\"name\":\"indextapadmin\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/thane-coastal-road-1-reaches-40-percent-completion\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/30d29d668e232943b9ab4325fe687de2dcef515c7a1b9e55553f8f18b6e372cf?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"indextapadmin\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/thane-coastal-road-1-reaches-40-percent-completion\\\/#webpage\",\"url\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/thane-coastal-road-1-reaches-40-percent-completion\\\/\",\"name\":\"Thane Coastal Road-1 Reaches 40% Completion\",\"description\":\"As construction on Thane Coastal Road-1 advances, commuters on the congested Ghodbunder Road may ultimately have an alternative route. According to the Mumbai Metropolitan Region Development Authority (MMRDA), the 13.45-kilometer corridor is 40% complete.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/thane-coastal-road-1-reaches-40-percent-completion\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/author\\\/indextapadmin\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/author\\\/indextapadmin\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Thane-Coastal-Road-1-Reaches-40-Completion.png\",\"@id\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/thane-coastal-road-1-reaches-40-percent-completion\\\/#mainImage\",\"width\":1672,\"height\":941,\"caption\":\"Thane Coastal Road-1 Reaches 40% Completion\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/thane-coastal-road-1-reaches-40-percent-completion\\\/#mainImage\"},\"datePublished\":\"2026-09-16T10:58:04+00:00\",\"dateModified\":\"2026-09-16T10:58:33+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/\",\"name\":\"IndexTap Blogs\",\"description\":\"Real Estate Market Updates, NEWS, Trends\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.indextap.com\\\/blog\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Thane Coastal Road-1 Reaches 40% Completion","description":"As construction on Thane Coastal Road-1 advances, commuters on the congested Ghodbunder Road may ultimately have an alternative route. According to the Mumbai Metropolitan Region Development Authority (MMRDA), the 13.45-kilometer corridor is 40% complete.","canonical_url":"https:\/\/www.indextap.com\/blog\/thane-coastal-road-1-reaches-40-percent-completion\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.indextap.com\/blog\/thane-coastal-road-1-reaches-40-percent-completion\/#blogposting","name":"Thane Coastal Road-1 Reaches 40% Completion","headline":"Thane Coastal Road-1 Reaches 40% Completion","author":{"@id":"https:\/\/www.indextap.com\/blog\/author\/indextapadmin\/#author"},"publisher":{"@id":"https:\/\/www.indextap.com\/blog\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.indextap.com\/blog\/wp-content\/uploads\/2026\/09\/Thane-Coastal-Road-1-Reaches-40-Completion.png","width":1672,"height":941,"caption":"Thane Coastal Road-1 Reaches 40% Completion"},"datePublished":"2026-09-16T10:58:04+00:00","dateModified":"2026-09-16T10:58:33+00:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.indextap.com\/blog\/thane-coastal-road-1-reaches-40-percent-completion\/#webpage"},"isPartOf":{"@id":"https:\/\/www.indextap.com\/blog\/thane-coastal-road-1-reaches-40-percent-completion\/#webpage"},"articleSection":"Blog"},{"@type":"BreadcrumbList","@id":"https:\/\/www.indextap.com\/blog\/thane-coastal-road-1-reaches-40-percent-completion\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.indextap.com\/blog#listItem","position":1,"name":"Home","item":"https:\/\/www.indextap.com\/blog","nextItem":{"@type":"ListItem","@id":"https:\/\/www.indextap.com\/blog\/category\/blog\/#listItem","name":"Blog"}},{"@type":"ListItem","@id":"https:\/\/www.indextap.com\/blog\/category\/blog\/#listItem","position":2,"name":"Blog","item":"https:\/\/www.indextap.com\/blog\/category\/blog\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.indextap.com\/blog\/thane-coastal-road-1-reaches-40-percent-completion\/#listItem","name":"Thane Coastal Road-1 Reaches 40% Completion"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.indextap.com\/blog#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.indextap.com\/blog\/thane-coastal-road-1-reaches-40-percent-completion\/#listItem","position":3,"name":"Thane Coastal Road-1 Reaches 40% Completion","previousItem":{"@type":"ListItem","@id":"https:\/\/www.indextap.com\/blog\/category\/blog\/#listItem","name":"Blog"}}]},{"@type":"Organization","@id":"https:\/\/www.indextap.com\/blog\/#organization","name":"IndexTap Blogs","description":"Real Estate Market Updates, NEWS, Trends","url":"https:\/\/www.indextap.com\/blog\/"},{"@type":"Person","@id":"https:\/\/www.indextap.com\/blog\/author\/indextapadmin\/#author","url":"https:\/\/www.indextap.com\/blog\/author\/indextapadmin\/","name":"indextapadmin","image":{"@type":"ImageObject","@id":"https:\/\/www.indextap.com\/blog\/thane-coastal-road-1-reaches-40-percent-completion\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/30d29d668e232943b9ab4325fe687de2dcef515c7a1b9e55553f8f18b6e372cf?s=96&d=mm&r=g","width":96,"height":96,"caption":"indextapadmin"}},{"@type":"WebPage","@id":"https:\/\/www.indextap.com\/blog\/thane-coastal-road-1-reaches-40-percent-completion\/#webpage","url":"https:\/\/www.indextap.com\/blog\/thane-coastal-road-1-reaches-40-percent-completion\/","name":"Thane Coastal Road-1 Reaches 40% Completion","description":"As construction on Thane Coastal Road-1 advances, commuters on the congested Ghodbunder Road may ultimately have an alternative route. According to the Mumbai Metropolitan Region Development Authority (MMRDA), the 13.45-kilometer corridor is 40% complete.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.indextap.com\/blog\/#website"},"breadcrumb":{"@id":"https:\/\/www.indextap.com\/blog\/thane-coastal-road-1-reaches-40-percent-completion\/#breadcrumblist"},"author":{"@id":"https:\/\/www.indextap.com\/blog\/author\/indextapadmin\/#author"},"creator":{"@id":"https:\/\/www.indextap.com\/blog\/author\/indextapadmin\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.indextap.com\/blog\/wp-content\/uploads\/2026\/09\/Thane-Coastal-Road-1-Reaches-40-Completion.png","@id":"https:\/\/www.indextap.com\/blog\/thane-coastal-road-1-reaches-40-percent-completion\/#mainImage","width":1672,"height":941,"caption":"Thane Coastal Road-1 Reaches 40% Completion"},"primaryImageOfPage":{"@id":"https:\/\/www.indextap.com\/blog\/thane-coastal-road-1-reaches-40-percent-completion\/#mainImage"},"datePublished":"2026-09-16T10:58:04+00:00","dateModified":"2026-09-16T10:58:33+00:00"},{"@type":"WebSite","@id":"https:\/\/www.indextap.com\/blog\/#website","url":"https:\/\/www.indextap.com\/blog\/","name":"IndexTap Blogs","description":"Real Estate Market Updates, NEWS, Trends","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.indextap.com\/blog\/#organization"}}]},"og:locale":"en_US","og:site_name":"IndexTap Blogs - Real Estate Market Updates, NEWS, Trends","og:type":"article","og:title":"Thane Coastal Road-1 Reaches 40% Completion","og:description":"As construction on Thane Coastal Road-1 advances, commuters on the congested Ghodbunder Road may ultimately have an alternative route. According to the Mumbai Metropolitan Region Development Authority (MMRDA), the 13.45-kilometer corridor is 40% complete.","og:url":"https:\/\/www.indextap.com\/blog\/thane-coastal-road-1-reaches-40-percent-completion\/","article:published_time":"2026-09-16T10:58:04+00:00","article:modified_time":"2026-09-16T10:58:33+00:00","twitter:card":"summary_large_image","twitter:title":"Thane Coastal Road-1 Reaches 40% Completion","twitter:description":"As construction on Thane Coastal Road-1 advances, commuters on the congested Ghodbunder Road may ultimately have an alternative route. According to the Mumbai Metropolitan Region Development Authority (MMRDA), the 13.45-kilometer corridor is 40% complete."},"aioseo_meta_data":{"post_id":"3614","title":"Thane Coastal Road-1 Reaches 40% Completion","description":"As construction on Thane Coastal Road-1 advances, commuters on the congested Ghodbunder Road may ultimately have an alternative route. According to the Mumbai Metropolitan Region Development Authority (MMRDA), the 13.45-kilometer corridor is 40% complete.","keywords":null,"keyphrases":{"focus":{"keyphrase":"thane coastal road","score":90,"analysis":{"keyphraseInTitle":{"score":9,"maxScore":9,"error":0},"keyphraseInDescription":{"score":9,"maxScore":9,"error":0},"keyphraseLength":{"score":9,"maxScore":9,"error":0,"length":3},"keyphraseInURL":{"score":5,"maxScore":5,"error":0},"keyphraseInIntroduction":{"score":9,"maxScore":9,"error":0},"keyphraseInSubHeadings":{"score":3,"maxScore":9,"error":1},"keyphraseInImageAlt":[],"keywordDensity":{"type":"best","score":9,"maxScore":9,"error":0}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-09-16 10:58:04","updated":"2026-09-16 11:21:17","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.indextap.com\/blog\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.indextap.com\/blog\/category\/blog\/\" title=\"Blog\">Blog<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tThane Coastal Road-1 Reaches 40% Completion\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.indextap.com\/blog"},{"label":"Blog","link":"https:\/\/www.indextap.com\/blog\/category\/blog\/"},{"label":"Thane Coastal Road-1 Reaches 40% Completion","link":"https:\/\/www.indextap.com\/blog\/thane-coastal-road-1-reaches-40-percent-completion\/"}],"_links":{"self":[{"href":"https:\/\/www.indextap.com\/blog\/wp-json\/wp\/v2\/posts\/3614","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.indextap.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.indextap.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.indextap.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.indextap.com\/blog\/wp-json\/wp\/v2\/comments?post=3614"}],"version-history":[{"count":1,"href":"https:\/\/www.indextap.com\/blog\/wp-json\/wp\/v2\/posts\/3614\/revisions"}],"predecessor-version":[{"id":3616,"href":"https:\/\/www.indextap.com\/blog\/wp-json\/wp\/v2\/posts\/3614\/revisions\/3616"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.indextap.com\/blog\/wp-json\/wp\/v2\/media\/3615"}],"wp:attachment":[{"href":"https:\/\/www.indextap.com\/blog\/wp-json\/wp\/v2\/media?parent=3614"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.indextap.com\/blog\/wp-json\/wp\/v2\/categories?post=3614"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.indextap.com\/blog\/wp-json\/wp\/v2\/tags?post=3614"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}